2010 Plans – Phase 1: Production Network

The first thing I need to do this year is finish getting my production network in order.

  • Document the existing production network.

Status: This has been completed. Well as completed as such a thing can be. It will always be in flux. Please see http://wiki.knownelement.com/index.php/Network_Stuff for details. It’s a very long page, and is quite thorough.

  • Backups and restores

Status: This is now completed. The production server, production server replica and development server is backed up to an external USB drive on a nightly basis. Home directories and system configuration (/etc and all mysql databases). Cisco gear is backed up nightly via rancid.

  • Redo development rack wiring from scratch and clean up office.

A few months ago Rufus and I redid the rack from scratch. Very happy with the layout (documented at the above wiki link), but the wiring leaves a bit to be desired.

Status: Completed.

  1. The production Ethernet and power has now been cleaned up. Much better then before. Liberal use of zipties, and more slack.
  2. Dev wiring is completed.
  3. Cleaned up office and outside storage space. I can now find things very quickly. :)